23.06
Hotel Professionally Acceptable – It Is Still Being Refurbished But The Strimmer Is Louder Even Than The Drilling And Hammering! - Tring.
Rising 07.15 fro m another strange NightWorld in this room. Morning Sitting and down to the trough c. 08.45.
To the theatre c. 11.15. A day filming with Toby Amies. The KC configuration was moved to have the frontline facing the back line.
First run-through began c. 90 minutes late c. 13.30. Second run-through beginning c. 17.00. The consensus suggests the second was much better than the first. Personal comments: general; an educational and informative undertaking of fine-tuning necessary in the band; specific; playing Fracture is never easy, and more difficult when being filmed for DVD release.
Walking back to the hotel with Mr. Bill c. 18.30: too tired to do something, too energised to do nothing.
Packing. A call from Toyah from her venue in Manchester. Supperising, shaving and showering before practising guitar.